Hot-Selling Custom Machining Heavy-Duty Truck Moving Shift Fork for Transmission Systems

Still deciding? Get samples of $ !
Request Sample

Product Description

i

Basic Specifications

Model NO.
DH-08277
Material
Alloy Steel
Certification
ISO9001
Suitable for
Truck / Heavy Machinery
Position
Gear System
Process
Forging + Machining
Tolerance
0.01mm ~ 0.02mm
Production Capacity
20,000 units

Product Description

The Gear Shift Fork is a critical component typically used in manual transmissions to move gear sets. Its precision U-shaped design ensures seamless engagement with the sliding gear sleeve to facilitate efficient shifting.

Material & Process Alloy Steel, high-pressure forged manufacturing process for maximum durability.
Production Steps Material inspection → Heating & Forging → Cooling & Machining → Surface Treatment → Final Testing.
Performance High strength, impact resistance, fatigue strength, and high wear resistance for heavy-duty applications.
Customization OEM/ODM available. Custom manufactured based on customer-provided drawings or specific technical requirements.
📦

Packaging & Shipping

Rust Prevention: Specialized inhibitors and surface coatings applied to prevent oxidation.
Secure Protection: Use of wooden crates, pallets, and cushioning materials like foam or airbags.
Global Logistics: Sea freight (25-30 days) or Air freight (approx. 7 days) available.

Our Capabilities

With 20 years of experience in the forging industry, we specialize in the design and production of industrial parts, auto components, and special alloy forgings. Our facilities support comprehensive mechanical design and professional production processes for the construction, railway, and petrochemical sectors.

?

Frequently Asked Questions

Which countries do you export to?
We export to major global markets including the USA, Germany, France, Italy, UK, Brazil, Sweden, Japan, Korea, Middle East Asia, and Thailand.
How long does it take to receive samples?
Patterns usually take 30-45 days, and samples take an additional 30 days after pattern completion. Lead times are for production and do not include transit time.
What is your quality control process?
We perform APQP at the early stage of every project. Our quality professionals conduct patrol inspections during manufacturing and final inspections before packing and dispatch.
What are the payment terms for international orders?
Generally, we request a 50% deposit for tooling and production, with the balance payable via T/T before or shortly after shipment. Terms are negotiable for long-term partners.
How long does sea shipping take from China?
It takes approximately 5-6 weeks to reach European ports and 2-3 weeks to the US (East/West coast), plus additional time for customs clearance.
Do you maintain client confidentiality?
Yes, we are fully committed to client confidentiality and are happy to sign and honor Non-Disclosure Agreements (NDA).

Related Products