New Product China Import Railway Coupler Draft Gear System

Still deciding? Get samples of $ !
Order Sample

Product Description

Overview & Basic Info
Model NO.
Draft Gear System
Certification
ISO14001, ISO/TS16949, ISO9001
Type
Train Coupler
Standards
AAR, Uic, En, GOST, Iris, Ksr, BS, JIS, Tb
Application
Train, Railway Wagon, Passenger Car, Locomotive
Production
Forging/Casting Production
Material
42CrMo, 4140, 50mn, Grade E Steel
Surface
Polish and Paint
Capacity
500,000 PCS/Year
Package Size
200.00cm * 200.00cm * 200.00cm
Product Description

The Draft Gear System, also known as the coupler system, is a critical mechanism for connecting rolling stock in a train sequence. We provide completed Draft Gear systems for freight wagons, passenger coaches, and locomotives based on specific railcar designs.

Product NameRailway Draft Gear System
Material GradeGrade E plus cast steel
Quality StandardAAR M-201
Operating Temp-34ºC to +121ºC (-30ºF to +250 ºF)
Service LifeNot less than 600,000 cycles
FeaturesDrop proof, High structure strength, Interchangeable, High safety
Detailed Photos & Components
Draft Gear System 1
Draft Gear System 2

System Components:

Component 1
Component 2
Component 3
Component 4
Component 5

Applications:

Application 1
Application 2
Service Excellence

✅ OEM and customized service tailored to railway requirements.

✅ Full machining, primer coating, and professional surface treatment.

✅ Comprehensive material testing and strict quality control processes.

✅ Technical support for 5-8 years of service life.

Frequently Asked Questions
How can I obtain a formal quotation?
Please provide detailed information including technical drawings, material specifications, weight, required quantity, and any specific requests.
What is the lead time for sample production?
Typically, it takes 20-30 days for mold creation and sample production. The exact timeframe depends on the product complexity.
Are small or trial orders accepted?
Yes, we support mini orders and trial orders to verify quality and compatibility.
What are the standard payment terms?
Mold costs require 100% TT advance. For main orders: a 40% deposit is required, with the 60% balance payable against the copy of the B/L.
What quality standards do these couplers meet?
Our systems are manufactured to meet AAR M-201, ISO9001, and other international railway standards like UIC and EN.
What is the operating temperature range?
The system is designed to operate reliably in extreme environments ranging from -34ºC to +121ºC.
Contact Us

If you have any questions regarding our Draft Gear Systems or require technical assistance, please feel free to reach out to our team.

Related Products